Home / Areas / Burbank

General Contractor in Burbank, CA

DN Builders Group is a licensed general building contractor based in Burbank, CA. We handle kitchen and bathroom remodels, whole-home renovations, additions, ADUs and custom builds for Burbank homeowners, with permits pulled through the City of Burbank’s own Building & Safety Division. Burbank writes its own zoning math, hillside review and district plans, so we check which rules apply to your lot first.

What we build in Burbank

Planning a backyard unit or garage conversion? Burbank’s ADU rules, including the Rancho and Mountain Fire Zone limits, are on our ADU builder in Burbank page.

Burbank is its own city hall — and its own utility

Burbank is not the City of Los Angeles. Plan check, permits and inspections run through Burbank Community Development at City Hall, 275 East Olive Avenue, not LADBS or the County. Our office is on North First Street, minutes from your job site. Typical review times are in how long a Burbank permit takes, and the side-by-side with Glendale and LA is in permits in Glendale vs Burbank vs LA.

The city bought its electric and water systems in 1913, and Burbank Water and Power still serves the whole city. Any service upgrade — a 100-amp panel going to 200 amps for a kitchen, a heat pump or an EV charger — is coordinated with BWP, not SCE or LADWP. See how panel upgrades work with BWP.

How big Burbank lets you build: the R-1 floor-area math

Before you plan an addition or second story, the number that matters is floor-area ratio. Burbank’s single-family code (Section 10-1-603, last amended by Ordinance No. 22-3,983 in December 2022) allows a maximum FAR of 0.4 on the first 7,500 sq ft of lot area in the R-1 and R-1-H zones, with lower ratios of 0.3 and 0.2 on larger lots. The city’s own table puts a 6,000 sq ft lot at 2,400 sq ft of gross floor area.

Three details catch people. An attic with a floor and a ceiling height of five feet or more counts toward FAR. One of the code’s options for stepping back a second story is keeping it to 85 percent of the first floor, and the side of a second story must also step back or fit under a 45-degree daylight plane starting 12 feet above grade. The main house is capped at a 20-foot top plate and a 30-foot pitched roof, or 23 feet for a flat roof. And no more than 45 percent of the front yard setback can be paved. We run these numbers on your lot before design starts — see also how much square footage you can add and what a second story costs.

Hillside lots: when a Hillside Development Permit kicks in

In Burbank’s hillside areas the FAR drops further, to 0.35 on slopes of 15 to 29.99 percent and 0.30 on slopes of 30 percent or more. A Hillside Development Permit is required when a project grades a new or expanded building pad, extends past the front or rear setback lines, reaches a roof height over 16 feet, or brings total floor area above 3,000 sq ft. Owners and occupants within 300 feet are mailed notice before a decision. A hillside house over 3,400 sq ft also needs three garage or carport spaces.

That review adds weeks, so we design under the triggers when the goals allow it and price the review when they don’t. More in hillside lots, the hidden costs and Chapter 7A fire hardening.

The Media District plan is being rewritten in 2026

The Media District Specific Plan dates from 1991 and was written mainly to protect the single-family streets around the studios from commercial creep. Its update covers about 544 acres and runs to 2035. On September 28, 2026 the Planning Commission voted 5–0 to recommend it, and the City Council has scheduled a public hearing for November 10, 2026. The draft narrows Olive Avenue, Pass Avenue and Riverside Drive by a lane each way.

For a restaurant or office build-out in the district, that means staging, deliveries and parking assumptions may change mid-project. For homeowners on nearby streets, residential permit parking districts may expand. See restaurant build-out timelines and what SB 79 changed in Burbank.

What we find behind Burbank walls

Most of Burbank is 1920s–40s bungalows and postwar tract houses. The common surprises are 60- or 100-amp panels, galvanized supply lines, cast-iron drains, unbolted foundations and older work that was never permitted. We price that up front. See what’s behind the walls of a 1950s Valley house, earthquake retrofits in Burbank and repipe costs. If your house is a designated Burbank historic resource, altering or adding to it needs its own city permit, and a Mills Act contract may be available in exchange for a 10-year restoration commitment.

What a remodel costs

Typical Los Angeles market ranges, not a quote: a mid-range bathroom $25,000–$45,000, a kitchen $45,000–$90,000, and a whole-home renovation $150–$400 per square foot. More detail in our Burbank kitchen cost guide and remodeling in Burbank.

Licensed and bonded

DN Builders Group holds an active California General Building license (#1139710), carries a $25,000 surety bond, and is fully insured. In California, any project over $500 in labor and materials legally requires a licensed contractor. Verify it with the California Contractors State License Board before you sign. Here is how to check a contractor’s license.

How we work

We walk the space, check the zone, slope and electrical service, and give you a fixed, itemized scope before anything is demolished. Permits are pulled by us. Change orders are approved in writing. You get a weekly update and a detailed walkthrough at the end. Finished work is on our portfolio page.

Questions

Are you a licensed contractor in Burbank?

Yes. DN Builders Group holds an active California General Building contractor license (#1139710), carries a $25,000 surety bond, and is fully insured. The license covers work in Burbank and throughout California, and can be verified with the California Contractors State License Board.

What does a remodel cost in Burbank?

A mid-range bathroom remodel typically runs $25,000 to $45,000, a kitchen remodel $45,000 to $90,000, and a whole-home renovation $150 to $400 per square foot. These are typical Los Angeles market ranges, not a quote. We give you a fixed, itemized bid after walking the space.

Do you pull permits in Burbank?

Yes. We prepare the drawings and handle plan check, permits and inspections with the City of Burbank Building & Safety Division at 275 East Olive Avenue, which is separate from LADBS. Electrical service changes are coordinated with Burbank Water and Power.

How big an addition can I build in Burbank?

It depends on lot size. Burbank allows a floor-area ratio of 0.4 on the first 7,500 sq ft of lot area in the R-1 and R-1-H zones, with lower ratios on larger lots, so a 6,000 sq ft lot tops out at 2,400 sq ft. Attics with a floor and a ceiling of five feet or more count, and hillside lots get a lower ratio.

When does a Burbank hillside home need a Hillside Development Permit?

When the project grades a new or expanded building pad, extends past the front or rear setback lines, reaches a roof height over 16 feet, or brings total floor area above 3,000 sq ft. Neighbors within 300 feet are mailed notice, so it adds time to the schedule.

Where else we work

Toluca Lake, Glendale, North Hollywood, Sunland-Tujunga, and Greater Los Angeles.

Get a fixed, itemized bid.

Licensed, bonded, and based in Burbank. We walk the space, price it honestly, and put it in writing before anything is demolished.

Request a consultation

Or call (818) 929-9173 · CA General Building License #1139710