General Contractor in West Hollywood, CA

DN Builders Group is a licensed general building contractor based in Burbank. We remodel kitchens and bathrooms, renovate condos and houses, build additions and ADUs, and take on office and commercial interiors in West Hollywood — a city with its own all-electronic plan check, two different water utilities and an ADU process that starts in the planning division, not at the building counter.

What we build in West Hollywood

Plan check is electronic only

West Hollywood is its own city, so permits go through the city's Building and Safety Division, not the City of Los Angeles. The division does not accept paper: plans and documents are filed through the city's Permit and License Portal, prepared to its e-plan standards, with the application completed and fees paid online. Staff then prescreen the upload for completeness, and the city says to allow at least three business days for that step before review begins. You can read the process on the city's plan check services page.

Two things in that process change how we plan a job. First, an incomplete set or files that miss the e-plan standards are the most common reason a review stalls, so we assemble the full package before anything is uploaded. Second, some County agencies that review West Hollywood projects are not connected to the city's system. If your project needs one of them, the submission to that agency is a separate step, and the city needs the approval back before the permit moves forward. We map those reviews at the start so they run in parallel instead of in a line.

ADUs start in the planning division

In West Hollywood an ADU application goes first to the Current and Historic Preservation Planning Division, which reviews a complete application within 60 days. Only after planning approves the plans do they go to Building and Safety for plan check, and the permit is issued after that. The city has also been updating its ADU rules to match recent state law, so we confirm the standards that apply to your lot before the drawings are finished. The state's own ADU guidance is a useful baseline for what a city can and cannot require.

For a homeowner, the practical point is the order of steps: design, planning review, then building plan check, then construction. A garage conversion and a new detached unit both follow that path, and we build the planning review into the schedule we give you rather than treating it as a surprise.

Two water utilities, one power company

Most of West Hollywood gets its water from the Los Angeles Department of Water and Power, but Beverly Hills Water serves certain areas on the west side of the city. Which one serves your address decides who you deal with for a new water service, a meter upgrade or a fire line, and whose rules and timeline apply. Electricity throughout the city comes from Southern California Edison. On a kitchen that goes all-electric, a panel upgrade or an ADU with its own meter, we identify the right utility early and start the request before it can hold up final inspection.

Condos, duplexes and older buildings

A lot of West Hollywood housing is condos, duplexes and small apartment buildings. Remodeling inside a shared building adds its own layer: HOA approval and work hours, protection of common areas, and plumbing or electrical that is shared with the unit next door. We review the HOA rules and the building's existing systems during the walkthrough, so the scope and the schedule account for them from day one. In older buildings we also expect to find work behind the walls that does not meet today's code, and we price how we handle it in writing before demolition.

Offices and commercial interiors

We also build out offices and commercial interiors: medical and professional suites, casework, flooring, lighting and finishes that stand up to daily use. Commercial work in West Hollywood goes through the same electronic plan check. You can see a medical office we built on our portfolio page.

Licensed and bonded

DN Builders Group holds an active California General Building license (#1139710), carries a $25,000 surety bond, and is fully insured. Any project over $500 in labor and materials legally requires a licensed contractor in California. Verify it with the Contractors State License Board before you sign. Here is how to check a contractor's license.

How we work

We walk the property, talk honestly about budget, and give you a fixed, itemized scope before anything is demolished. We pull the permits. Change orders are approved in writing, never sprung at the end. Weekly updates, and a detailed walkthrough at the finish. The price is in writing before work starts, so there is nothing to guess at.

Questions

Who issues building permits in West Hollywood?

The City of West Hollywood Building and Safety Division. Plans are filed electronically through the city's Permit and License Portal; the division does not accept paper plans.

How long does the city take to check a submittal for completeness?

The city says to allow at least three business days for staff to prescreen an upload for completeness. Review starts after the package is verified complete.

How are ADUs approved in West Hollywood?

An ADU application goes first to the Current and Historic Preservation Planning Division, which reviews a complete application within 60 days. Approved plans then go to Building and Safety for plan check before a permit is issued.

Who provides water and power in West Hollywood?

Most of the city gets water from the Los Angeles Department of Water and Power; Beverly Hills Water serves certain areas on the west side. Electricity comes from Southern California Edison.

Where else we work

Beverly Hills, Silver Lake, Studio City, Culver City, and Greater Los Angeles.

Get a fixed, itemized bid.

Licensed, bonded, and based in Burbank. We walk the property, check plan check, utilities and HOA rules before we price it, and put the scope in writing before anything is demolished.